IRRs behind GTCs follow basepoints (NPRR1111/SCR819)
The Gist SCR819/NPRR1111 will require Intermittent Renewable Resources (IIRs) to follow their base points if they are behind a Generic Transmission Constraint that is in danger of being violated. It is currently tabled at PRS. As ERCOT puts it, “With each SCED Base Point sent by ERCOT to the Qualified Scheduling Entity (QSE) representing an…